image
Drew Sturzione of Allen Park (right) helps load the chains on a trailer that held a backhoe being used on the College Place construction site this past Friday. Construction is scheduled to be completed by Aug. 22.
Drew Sturzione of Allen Park (right) helps load the chains on a trailer that held a backhoe being used on the College Place construction site this past Friday. Construction is scheduled to be completed by Aug. 22.